Open burning season is from January
15 through May 1.
A permit is required for open burning and can be picked up at the
fire station headquarters (99 Revere St) starting January 15.
Please
be advised:
Per order of the Department of Environmental Protection (MassDEP),
permits for open burning will based on the day to day air quality.
If the air quality on any particular day is considered not healthy
enough for burning, permits may not be issued. The following link on
Massachusetts Department of Environmental Protection website will
give air quality readings daily at 8am.
Fireworks FP-27
General
Permit FP-6
Tank
Removal FP-292
Tank Trucks
FP-44
Oil
Burner CMR-4 Form1
Flammable/Combustible Liquids
Massachusetts Department of Environmental Protection
Some
basic rules for open burning
- Burning must be at least 75 ft from any buildings.
- Burning must be conducted between the hours of 10am and 4pm.
- Fire must be attended until completely extinguished.
- Have fire control tools on hand including a water supply,
shovels and rakes.
- Use
common sense when weather changes. Extinguish fire immediately if
the wind becomes too strong.
- Should the fire get out of hand, don’t delay on calling the
fire department.
Safety
Tips for Open Burning Season
Permit Fees
|
Permit Type |
|
FORM |
|
Ammunition Storage |
$15.00 |
FP 6 |
|
Black Powder |
$15.00 |
FP 6 |
|
Smokeless Powder |
$15.00 |
FP 6 |
|
Blasting/ 30 Days Max |
$50.00 |
FP 6 |
|
Cutting and Welding |
$25.00 |
FP 6 |
|
Explosives Storage |
$15.00 |
FP 6 |
|
Fireworks |
$85.00 |
FP 27 |
|
Flam/Comb Liquids |
$25.00 |
FP 6 |
|
Flammable Gases |
$25.00 |
FP 6 |
|
Flammable Solids |
$25.00 |
|
|
Miscellaneous |
$15.00 |
|
|
Oil Burners |
$20.00 |
Form 1 |
|
Open Burning |
$0.00 |
FP 6 |
|
Report By Mail |
$10.00 |
|
|
Report Picked Up |
$5.00 |
|
| |
|
|
|
Per Tank Fee |
|
|
|
Storage Tank (Maintained) |
$35.00 |
|
|
Tank Installation
Residential |
$25.00 |
Form 1 |
|
Tank Installation
Commercial |
|
|
|
0 to 100 Gallons |
$50.00 |
Form 1 |
|
101 to 5000Gallons |
$75.00 |
Form 1 |
|
Greater than 5001 Gallons |
$100.00 |
Form 1 |
|
Tank Removal Residential |
$25.00 |
FP 292 |
|
Tank Removal Comercial |
$100.00 |
FP 292 |
|
Transfer Tank |
$25.00 |
FP 44 |
|
Tank Truck Inspection |
$50.00 |
FP 44 |
|
Tar Kettles |
$15.00 |
FP 6 |
|
Liquid Propane/ per
1000 Gallons |
|
|
|
LP Gas Residential |
$25.00 |
FP6 |
|
LP Gas Commercial |
$35.00 |
FP6 |
|
Residential Fees |
|
FORM |
|
Plan Review / Single
Family |
$25.00 |
|
|
Plan Review / Multi-
Family |
$35.00 |
|
|
Smoke/CO Inspection |
$50.00 |
|
|
Re Inspection |
$15.00 |
|
| |
|
|
|
Commercial Fees |
|
|
|
Plan
Review Fire Protection/per page |
$10.00 |
|
|
Final Inspection |
$50.00 |
|
|
Sprinkler Work |
$25.00 |
FP 6 |
|
Fire Alarm Work |
$25.00 |
FP 6 |
|
Master Box Fees |
|
|
Master Box Permit |
$30.00 |
|
Master Box Connection |
$125.00 |
|
Master Box Monitoring |
$250.00 |
| |
|
|
False Alarms |
|
|
1 to 3 |
Warning |
|
4 to 6 |
$150.00 |
|
7 to 11 |
$250.00 |
|
More than 11 |
$500.00 |